Hello Champs,
There is plan of our existing ERP 6.0 system upgrade to EHP7, how we can proceed the same. Can anyone let me know the process like from where to where i have to go.
Current System SP level- ERP 6.0 EHP3 With latest SPS , Dual stack & Configured with Solman 7.1 SPS10
Target System - ERP 6.0 EHP7 Single or Dual stack
I have performed multiple EHP upgrades of various component with different os/db combo. But the thing is we cannot performed EHP7 upgrade of dual stack system, that's why i am here to discuss with all of you.
I have 2 scenario in my mind to achieve the goal.
1- First Upgrade the ECC dual stack till ehp6, then performed Split of the ECC system (ABAP & JAVA) , and then go to separately EHP7 upgrade.
2- First split the system at current level itself (ERP 6.0 EHP3), then go for EHP7 separately for both stack upgrade.
Which one would be better for us in terms of Fast process/ Safety/ Less effort and last one not the least Less solman MOPZ activities while doing split and separate upgrade of both stack ??
Regards,
Gaurav