We are updating to EHP7 for SAP ERP 6.0 and I left the defaults for number of parallel R3trans processes in the preparation phases. That was a mistake because SHD_IMPORT_INC is going to run for 5 days at this rate. I want to interrupt the phase and resume with a maximum of 8 parallel processes. Where do I set that I want 8 parallel processes? SHDALLIMP.TPP only shows dynamic parameters.
Warm Regards,
CM