Hi,
Is it possible to upgrade my SAP system from ECC 6.0 EHP5 to EHP7? or do I need to perform the upgrade to EHP6 first and then from EHP6 to EHP7?
My system is currently on
- SAP_BASIS 7.02
- SAP_APPL 605
- EA-APPL 605
Thanks
Hi,
Is it possible to upgrade my SAP system from ECC 6.0 EHP5 to EHP7? or do I need to perform the upgrade to EHP6 first and then from EHP6 to EHP7?
My system is currently on
Thanks