Hi Experts,
I am planning to upgrade my SAP ECC 6 (SAP Netweaver 7.0) systems to SAP ECC 6 EHP7. The Systems run on HP-UX 11.31 with Oracle 11g. Could anyone tell me If I can do that directly?
Which are the steps (in general terms) needed to do this upgrade? Another issue is that I have a large number of custom programas (Z). Will these programs require adjustments?
Thank you in advance.
Gastao Alfredo Gome
SAP Basis Admin
Bank of Mozambique