Quantcast
Channel: SCN : Discussion List - SAP Enhancement Packages
Viewing all articles
Browse latest Browse all 389

EHP6 Upgrade - MAIN_SHDRUN/DDIC_UPG

$
0
0

Hello,

I am performing EHP6 upgrade and I am kinda stuck in pre-processing phase. I am getting the following error message.

 

       Last error code set: RFC login to system SID ashost ip nr 06 gwhost host gwservice sapgw06 failed with code 1 key RFC_COMMUNICATION_FAILURE:

 

SAPup. log file has the below message

 

CURRENTPHASE MAIN_SHDRUN/DDIC_UPG

...started at 20140806142416

# INFO: Nothing has been done in this phase.

..timestimes self: 2.080/0.410 usr/sys, children 1.390/0.690 usr/sys.

..finished at 20140806142539 with status SUCCEEDED.

# Error message set: 'RRFC login to system SID ashost ip nr 06 gwhost host gwservice sapgw06 failed with code 1 key RFC_COMMUNICATION_FAILURE:

LOCATION    CPIC (TCP/IP) on local host with Unicode

ERROR       partner '172.17.60.165:3306' not reached

TIME        Wed Aug  6 14:25:39 2014

RELEASE     721

COMPONENT   NI (network interface)

VERSION     40

RC          -10

MODULE      nixxi.cpp

LINE        2895

DETAIL      NiPConnect: 172.17.60.165:3306

SYSTEM CALL connect

ERRNO       239

ERRNO TEXT  Connection refused

COUNTER     18

'

...begin dialog at 20140806142541

 

What amuse me is that, I don't find executable's for starting the shadow instance under . /SUMdirectory/ abap/bin/ directory. startshd and stopshd files are missing.

 

I used the command sapcontrol  -nr 06  -function Start to start my shadow instance and its started, but I am still getting the same error if I continue the phase.

 

I am doubting if the kernel is having any issue but I am unable to crack it.

 

Any help would be great.

 

Regards

Hari


Viewing all articles
Browse latest Browse all 389

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>