Hello,
I am performing EHP6 upgrade and I am kinda stuck in pre-processing phase. I am getting the following error message.
Last error code set: RFC login to system SID ashost ip nr 06 gwhost host gwservice sapgw06 failed with code 1 key RFC_COMMUNICATION_FAILURE:
SAPup. log file has the below message
CURRENTPHASE MAIN_SHDRUN/DDIC_UPG
...started at 20140806142416
# INFO: Nothing has been done in this phase.
..timestimes self: 2.080/0.410 usr/sys, children 1.390/0.690 usr/sys.
..finished at 20140806142539 with status SUCCEEDED.
# Error message set: 'RRFC login to system SID ashost ip nr 06 gwhost host gwservice sapgw06 failed with code 1 key RFC_COMMUNICATION_FAILURE:
LOCATION CPIC (TCP/IP) on local host with Unicode
ERROR partner '172.17.60.165:3306' not reached
TIME Wed Aug 6 14:25:39 2014
RELEASE 721
COMPONENT NI (network interface)
VERSION 40
RC -10
MODULE nixxi.cpp
LINE 2895
DETAIL NiPConnect: 172.17.60.165:3306
SYSTEM CALL connect
ERRNO 239
ERRNO TEXT Connection refused
COUNTER 18
'
...begin dialog at 20140806142541
What amuse me is that, I don't find executable's for starting the shadow instance under . /SUMdirectory/ abap/bin/ directory. startshd and stopshd files are missing.
I used the command sapcontrol -nr 06 -function Start to start my shadow instance and its started, but I am still getting the same error if I continue the phase.
I am doubting if the kernel is having any issue but I am unable to crack it.
Any help would be great.
Regards
Hari