Upgrade SAP Netweaver without EHP

Hi experts, Context : SAP ERP 6.0 EHP5 SAP_BASIS 7.02 Kernel 7.21 Could you please confirm that we can upgrade Netweaver 7.02 to 7.31 (or 7.40) without upgrade to ERP EHP6 (or 7) as we want to deploy...

View Article


Upgrade phase Preprocessing SHADOW_IMPORT_INC aborted

Hello all, I am patch CRM7.0 EPH1 to EPH2  to sp14 using SUM. I am getting error at Upgrade phase "SHADOW_IMPORT_INC".   Detected the following errors due to error summary in SHDALLIMP.ELG:#...

View Article


Software Update Manager 1.0 SUM SP06 - PI Java Stack Upgrade

Dears,  Greeting, actually I useing SUM Software Update Manager 1.0 SP 6 to update our NW PI Server Java Stack, so when I try to log on to SUM GUI  through GUI or Web GUI it response and ask for user...

View Article

Image may be NSFW.
Clik here to view.

Phase MAIN_SHDIMP/SUBMOD_SHD2_RUN/TABIM_POST_SHD is in hanged status

Hi Team,  I m upgrading solman to SPS11 stack using SUM tool my upgrade is currently in preprocessing stage and In step ENH mass activation In the background in SAP Shadow system it triggers a job...

View Article

PHASE: MAIN_NEWBAS/JOB_RSI18N_UPGUCLANG - Memory ID 51 not found

Hey SAP'pies We are stucked in an upgrade from ERP 6.04 to 6.07 Error message:SAPup broke during phase JOB_RSI18N_UPGUCLANG in module MAIN_NEWBASDowntime II: Conversion, Main Import, XPRAs Error...

View Article


Apply support package at DR site in VM farm

Dear experts Our company is running VM farm for servers e.g. SAP at DC and DR site and apply support package is ongoing. DEV & QAS were applied and this round is about to apply in PRD which data...

View Article

Update Support package HR

ERP 6.0  EHP4Windows 2003 ServerSQL Server 2008.  Hi, 3 monthsago, weupgradedtothesupport packagestack12. Now, due tonewparticularitywas askedto verify the possibilityto updateonly thesupport...

View Article

EHP7 Upgrade and BW Upgrade at the same time - possible?

Hello everyone, we are currently planning to upgrade our ERP system from EHP 5 to 7 and BW from NetWeaver 7.3 EHP 1 to 7.4. NetWeaver and Kernel will also obtain an upgrade.Is it possible to do the ERP...

View Article


SAPehpi didn`t start

HI, We stopped SAPehpi for a pause and when we went to restart it we got the folloing error message > ./STARTUPChecking if C++ runtime is installed ...Starting from /usr/sap/AA2/EHPI/sdt...Checking...

View Article


Image may be NSFW.
Clik here to view.

EHP6 - Severe error(s) occurred in phase PREP_INPUT/KX_CPYORG!

Hi All,We are at the "extraction" stage of our EHP6 upgrade for pre-prod system, this serves as rehearsal for the execution of the same upgrade in production system. However, SUM is stopped due to...

View Article

MAIN_SHDRUN/ACT_UPG - long time

HIOur EHP upgrade running on subjected phase; We are very sure, it is very expensive phase in TIME, But my concern is  in folder<EHP ROOT FOLDER>I/abap/log none of the logs file stamps are not...

View Article

EHPI PREP_INPUT/INSTANCELIST_PRE fails on SIDADM Password

PREP_INPUT/INSTANCELIST_PRE fails with >>>> Required system passwords <<<< The system is running in a distributed environment. To be able to proceed, the<SID>adm user will...

View Article

CIN Activation in SAP 4.7 C

Hi All, Currently we are using 4.7 c verion and need to implement CIN. Please help he how to activate and what are notes or packages to implement to 100% utillisation CIN. Regards,Muru..

View Article


Issue searching for OSS notes relevant for a specific SP

Hello, I faced a strange issue while searching for OSS notes, in the sense that If I search OSS Notes relevant from a specific Support package, theoutput list doesn't contain all the relevant notes...

View Article

Upgrade phase Preprocessing SHADOW_IMPORT_INC aborted

Hello all, I am patch CRM7.0 EPH1 to EPH2  to sp14 using SUM. I am getting error at Upgrade phase "SHADOW_IMPORT_INC".   Detected the following errors due to error summary in SHDALLIMP.ELG:#...

View Article


EHP7 upgrade dependency when ESS and MSS services are used.

Hi Team,We are planning for EHP7 upgrade We are using the ESS and MSS services. Please let us know the dependency while the upgrade. Let us know what all things to be taken care as part of ESS and MSS....

View Article

Long long run MAIN_SHDRUN/ACT_UPG with all component Update to EHP6 SPS05

Hi experts,     any suggestion on long run of phase MAIN_SHDRUN/ACT_UPG in ABAP all components (HR,all IS-* solution) updated to EHP6 SPS05 from EHP6 ERP6.0 initial install ? And firstly anfortunate...

View Article


PHASE: MAIN_NEWBAS/JOB_RSI18N_UPGUCLANG - Memory ID 51 not found

Hey SAP'pies We are stucked in an upgrade from ERP 6.04 to 6.07 Error message:SAPup broke during phase JOB_RSI18N_UPGUCLANG in module MAIN_NEWBASDowntime II: Conversion, Main Import, XPRAs Error...

View Article

Severe error(s) occured in phase PREP_INPUT/KX_CPYORG!

We are installing the EHP4 on a ERP 6.0 EHP4 ready ABAP system. ( MSCSInstallation) We are using SAP EHP INSTALLER 7.00 .( latest version)However , while in extraction phase we are getting...

View Article

EHP6 Upgrade - MAIN_SHDRUN/DDIC_UPG

Hello,I am performing EHP6 upgrade and I am kinda stuck in pre-processing phase. I am getting the following error message.        Last error code set: RFC login to system SID ashost ip nr 06 gwhost...

View Article