Hi Team,
I m upgrading solman to SPS11 stack using SUM tool my upgrade is currently in preprocessing stage and In step ENH mass activation
In the background in SAP Shadow system it triggers a job called RDDGEN0L which is active from very long time and CPU utilization is 0 also all workprocesses in SM50 is in waiting state
So job and upgrade step is in hanged state, As per Job log it "reached enque lock for mass activation"
Please suggest what could be possible reason and how to fix this issue
System information
SAP SOLUTION MANAGER 7.1
Database system ORACLE
Release 11.2.0.3.0
Operating System Windows
Machine Type 4x X86_64
SAP_BASIS : 702